The short answer: Most replacement cost policies pay in two stages. First, the insurer pays the actual cash value (ACV), which for a partial loss is generally the cost to repair or replace less a reasonable deduction for physical depreciation. The difference between ACV and full replacement cost, often called the depreciation holdback, is paid when the home is actually rebuilt or replaced. After a loss tied to a declared state of emergency, California gives policyholders at least 36 months from the first ACV payment to collect full replacement cost, with additional six-month extensions for good cause.

Key takeaways

  • The first payment is often ACV, not the full amount the policy may ultimately pay.
  • The holdback is usually collected by rebuilding or replacing and submitting proof of cost.
  • In a declared emergency, the window to collect it is at least 36 months from the first ACV payment.

The two numbers

Actual cash value. California Insurance Code section 2051 defines ACV. For a total loss to a structure, it is generally the policy limit or the fair market value of the structure, whichever is less. For a partial loss, it is generally the cost to repair, rebuild or replace, less a fair and reasonable deduction for physical depreciation based on the property’s condition at the time of the loss, or the policy limit, whichever is less.

Replacement cost. Under Insurance Code section 2051.5, replacement cost is what it would cost to repair, rebuild or replace the property with materials of like kind and quality, without deduction for depreciation, up to the policy limits.

The gap between the two is the amount many homeowners hear described as “recoverable depreciation.”

How the holdback works

If the policy requires the homeowner to repair, rebuild or replace in order to collect full replacement cost (most do), section 2051.5 requires the insurer to pay ACV first. The balance becomes payable as the work is done and costs are incurred, up to the limits.

In practice, insurers often release the holdback in stages as construction progresses, based on contracts, invoices and draw schedules. Ask your insurer how it will handle progress payments rather than assuming it will wait until the end.

How long you have

For a loss relating to a declared state of emergency, Insurance Code section 2051.5(b) provides that a time limit of less than 36 months from the first ACV payment cannot be imposed to collect full replacement cost. The insurer must grant additional six-month extensions for good cause, for example when permitting or contractor availability delays reconstruction despite the homeowner’s diligence.

For January 2025 losses, the first ACV payment came at different times for different families, so each household’s 36-month window is different. Find the date of your first ACV payment and put it on the calendar.

Rebuilding somewhere else

You do not have to rebuild on the same lot to collect replacement cost. California allows homeowners with a total loss to rebuild at another location or buy an existing home, and the value of the land at the new location cannot be deducted. The payment is still capped at what it would have cost to rebuild at the original site. See our article on rebuilding or buying elsewhere.

Practical tips

  1. Ask the insurer for a written breakdown of ACV, depreciation and replacement cost for each coverage.
  2. Ask how depreciation was calculated, item by item.
  3. Ask how and when holdback payments will be released during construction.
  4. Keep every contract, invoice and proof of payment organized by coverage.
  5. Calendar the 36-month date and request any extension in writing, with reasons, before it arrives.

Frequently asked questions

Why was my first check less than my policy limit?

Insurers typically pay actual cash value first and hold back depreciation until you rebuild or replace. The first check can be well below the replacement cost the policy may ultimately pay.

How long do I have to collect recoverable depreciation after the Palisades fire?

In a declared emergency, at least 36 months from the date of the first actual cash value payment, with six-month extensions for good cause.

If I don’t rebuild, do I lose the holdback?

Under most policies, the holdback is paid only if you rebuild or replace. California lets you replace by building elsewhere or buying an existing home, subject to limits.

Questions about your own claim? Jonathan reviews every request personally. Request a review or get new articles by email.

Related reading

Sources

About the author. Jonathan R. Bloch is a Beverly Hills real estate attorney with more than 30 years in practice and the founder of Bloch Advisory Services, which advises homeowners, owners and developers on Pacific Palisades rebuilding and property insurance claims. More about Jonathan.

This article provides general information and is not legal, insurance or financial advice. Laws and deadlines change, and how they apply depends on your policy and facts. Reading this article or contacting Bloch Advisory Services does not create an attorney-client relationship. Attorney advertising. Jonathan R. Bloch, Bloch Advisory Services, 9701 Wilshire Blvd., Suite 1000, Beverly Hills, CA 90212.

With more than three decades in top-tier legal practice, Jonathan Bloch has established a reputation as an elite legal strategist and trusted real estate advisor. Following decades as a partner at prominent regional and national firms, he founded Bloch Advisory Services to deliver responsive, hands-on counsel tailored to high-net-worth individuals, developers, and private investment entities without institutional bureaucracy.

Contact Info

424.512.1013

9701 Wilshire Blvd.
Suite 1000
Beverly Hills, CA 90212
UP